Stage-based planning, targets first.
Set the targets, then build the well in stages: kickoff, build rates, hold inclinations, and the landing. Each stage carries its own dogleg, inclination, and azimuth intent, and the builder solves the trajectory through them — the same way a directional plan is actually drawn up on location.
- Stage-based well plan builder
- Targets, build rates, and holds
- Plan trajectory solved in the record

